← All work

Creative agencies · Project kickoff

TimelineForge

Paste a discovery transcript, get a defensible project timeline with dependencies, risks, and a one-click client approval link, in under two minutes.

Self-initiated concept build2026Next.jsTypeScriptSupabaseClaude APITailwind CSS

See it run

Just under a minute from a pasted discovery call to an approved plan: the synthesised brief, a dependency-aware schedule against a date that will not move, the risks named, and the client sign-off link.

The problem

Scope creep doesn't start in week five. It starts when nobody defined the edges at kickoff. Briefs get rewritten three times, SOWs contradict the brief, and the handoff to creative drops context.

The intake-to-kickoff stretch is where agency projects lose momentum before any creative work happens.

The insight

Scope creep gets treated as a project-management failure in week five. It is an intake failure from week zero: the edges were never drawn, so every later conversation is a renegotiation of something that was never agreed in the first place.

That makes the 48 hours after discovery the highest-leverage window in the entire engagement. And the approval link matters more than the timeline: a document is an opinion, a signed-off link is a commitment you can point at later.

What it does

Leave a discovery call with a defensible timeline, the risks named, and a link the client can actually sign.

Transcript to timeline

Paste a discovery transcript or brief; get a structured timeline with phases, dependencies, and dates.

Risk flagging

AI flags the assumptions and gaps that turn into scope creep, before the SOW is signed.

Capacity hints

Timeline suggestions account for team capacity, not just calendar math.

Client approval link

One click generates a shareable approval link, closing the loop between agency and client.

How it works

  1. Ingest

    The discovery transcript or brief is parsed for deliverables, constraints, and unknowns.

  2. Forge

    A dependency-aware timeline is generated with phase durations and capacity hints.

  3. Flag

    Risks and undefined edges are surfaced for the PM to resolve or accept.

  4. Approve

    The client receives a clean approval link; sign-off is tracked.

Who this is for

A fit if

  • Agencies and studios running several client projects at once, where a PM or account lead owns kickoff.
  • Teams that have been burned by a project where nobody could point to what was actually agreed.
  • Shops where discovery happens on a call and then evaporates into somebody's notes.

Probably not for you if

It isn't for teams already living inside a rigid PM system they like. This replaces the intake-to-kickoff stretch, not your project tracker.

What this would take

A build like TimelineForge runs as a Build engagement: four to six weeks to a deployed system. Where it starts is usually an Audit, because kickoff is rarely the only place an agency leaks time and it is worth knowing which leak is biggest first.

Audit

2 weeks

Build

4–6 weeks

Retainer

per month · 6-month minimum

Full detail →

Work

Site

Contact

myles1908@hotmail.com

The fastest way to reach me. I read every email myself.

© 2026 Myles Smith. All rights reserved.

Designed & built by Myles Smith